- Home
- Departments
- SASM Wastewater
- Projects
- Completed Projects
Completed Projects
-
Shelter Bay & Frontage Rd Pump Station Improvements
This project was completed in September 2021 Location: 6000 Shelter Bay Road Mill Valley, CA 94941
Link to page -
Digester #1 Rehabilitation
The high priority contract involving the removal and disposal of a deteriorated 50-foot diameter metal dome/roof from Digester #1 tank was demolished, removed, and completed on Jan 29, 2021. The new roof lid was constructed of Stainless-Steel (Grade 316) due to its high corrosive resistance material and will not require any maintenance painting. Work included sandblasting the tank interior walls plus concrete repairs and an interior tank poly-urethane coating. Additionally, all the deteriorated internal metal piping and valves were replaced at the end of July. The last delivery of the stainless-steel roof lid panels arrived on 09/13/2021. Overaa assembled and welded the new roof that was lifted into place on 10/20/2021. Additional piping, ballast block installation, and lid pressure testing, and staff training was performed on 12/02/2021. After the completion of several punch list items, the new lid is fully commissioned and operational since January 14, 2022.
Link to page -
Pipeline Cathodic Protection System Upgrades
NOTICE OF CONSTRUCTION WORK COMPLETION Project Work: Pipeline Cathodic Protection System Upgrades Work Site Location: East of 450 Sycamore Avenue, Mill Valley
Link to page

